Guide updated 19 October 2026 · By David Peralta Rojas, lawyer (Seville Bar no. 15174)

Marbella’s new urban plan (PGOM): what it means for your property

Marbella has approved its new General Plan. It is good news for legal certainty, but it does not legalise any home on its own and it is not yet in force. This guide explains, with the rules to hand, what changes, what stays the same and what to do if you own, buy or sell property in Marbella.

The essentials

Five points to get right

  1. 01

    It does not legalise homes

    The plan sets the overall framework. Each irregular home needs its own procedure: AFO recognition, a licence or a detailed plan.

  2. 02

    It is not in force yet

    It will be, the day after it is published in the Málaga provincial gazette together with its planning rules.

  3. 03

    The 1986 plan still matters

    Its detailed rules (heights, buildable area, plot regulations) apply until the POU is approved.

  4. 04

    11 irregular areas identified

    Eleven groups of homes on rural land are placed, for now, under AFO status until their special plan or detailed planning is approved.

  5. 05

    Each case is different

    What changes for you depends on your plot, the licence the home was built with and when the works were finished.

Your case

Which situation is your property in?

These are the most common situations. Each has different consequences for building work, selling, letting and getting a mortgage.

Situation 1

Lawful and in line with the new plan

What it means
Built with a valid licence and consistent with the new planning.
What you can do
You can carry out licensed works, sell and mortgage as normal. Keep the building licence and first occupancy licence to hand.
Situation 2

Lawful, but no longer conforming (fuera de ordenación)

What it means
It has a licence, but the new plan provides for something else on that land (transitional provision 1).
What you can do
If fully incompatible (it occupies a road or public land), only repairs and upkeep. If partly incompatible, refurbishment, strengthening and even improvement, without touching what causes the incompatibility.
Situation 3

No licence, or an annulled licence, finished over 6 years ago

What it means
The town hall can no longer order demolition because time has run out (art. 153 LISTA).
What you can do
You can apply for AFO status (asimilado a fuera de ordenación). It does not legalise the home, but it allows utility connections and upkeep or refurbishment works without adding volume or footprint. It is noted in the Land Registry.
Situation 4

In one of the 11 irregular areas

What it means
Groups of houses on rural land, such as El Potril, Los Molineros or north of Las Chapas (art. 4.6.1 of the rules).
What you can do
They are placed under AFO status for now. Some will be integrated into the town and others will get a special plan. Owners may face development duties and costs under that plan.
Situation 5

Works finished less than 6 years ago

What it means
The authority is still within its time limit to act.
What you can do
AFO is not available. Enforcement proceedings are possible. It can only be legalised with a licence if the works fit the plan.
Situation 6

Public land, coastal zones, green areas or risk zones

What it means
Public domain and easements, the coastal influence zone on rural land, green areas, areas at real risk.
What you can do
There is no time limit here: the authority can act at any time (art. 153.2 LISTA). A specific study is needed before buying or building.

A detail almost nobody explains: on urban land that does not yet have detailed planning, existing buildings «may be treated as assimilated to non-conforming status» (AFO) until that planning is approved (art. 2.2.1.3 of the rules). That is why it matters to check exactly which rules apply to your plot.

What to do now

Your checklist, by situation

If you own a property

  • Ask the town hall for your home’s licence file and a planning information certificate.
  • Compare what is built with the licence, the Cadastre and the Land Registry extract.
  • If there are unlicensed works over 6 years old, consider applying for AFO now (decision within 6 months).
  • Before refurbishing or extending, check whether the home is non-conforming.
  • If you are in one of the 11 areas, keep every document that proves how old the house is.

If you are buying

  • Do not sign a reservation or deposit contract (arras) without a planning check: these are the property searches your solicitor should run.
  • Ask for the building licence and first occupancy licence, or the AFO resolution.
  • Check for open planning enforcement files.
  • Make the contract conditional on the planning position before exchange and completion.
  • If you need a mortgage, speak to the bank first: the valuer will check the same points.

If you are selling

  • Put the paperwork in order before listing: licences, as-built declaration (obra nueva) and AFO.
  • Unlicensed extensions must be disclosed to the buyer: hiding them creates liability.
  • An old extension missing from the Land Registry can be registered with a certificate of age.

If you develop or invest

  • The PGOM creates no new development sectors on rural land.
  • Plans already in progress have 3 or 5 years to reach final approval (transitional provision 4).
  • New developments reserve the affordable-housing share set by law; the town hall cites 20%.
  • The 1986 building rules keep applying until the POU.

If you run a holiday let

  • The PGOM does not regulate holiday lets.
  • A new holiday let in a building needs prior approval from the community of owners (3/5 majority).
  • An irregular planning position can complicate registration and the activity: check it before you invest.

Timeline

How we got here and what comes next

  1. 30 March 2023Initial approval of the PGOM and first public consultation (174 objections).
  2. 31 May 2024Second public consultation (147 objections).
  3. 27 June 2025Final proposal of the plan.
  4. 22 December 2025Strategic environmental statement published in the BOJA.
  5. February 2026Favourable report from the Andalusian regional government.
  6. 18 September 2026Final approval by the council: 19 votes in favour (PP, OSP and VOX), PSOE abstaining.
  7. 9 October 2026Environmental notice in BOJA no. 197.
  8. PendingPublication of the approval and planning rules in the Málaga provincial gazette. The plan takes effect the next day.
  9. Two months from that publicationDeadline to challenge the plan before the High Court of Andalusia.
  10. One year from entry into forceDeadline for unlicensed industrial and private facility buildings on rural land, over 6 years old, to obtain their permit (transitional provision 2).
  11. No official dateApproval of the POU, which will set the detail for every urban plot.

Who decides what

PGOM, POU and the 1986 plan, explained

What it decidesStatus today
PGOM (new General Plan)The town model: which land is urban or rural, major infrastructure, protected areas, the regime for irregular areas.Approved on 18/09/2026. In force the day after publication in the provincial gazette.
POU (Urban Plan)Detail for urban land: heights, buildable area, uses and regulations for each plot.In preparation. No initial approval.
1986 General PlanToday, everything. Once the PGOM is in force, only the detailed rules for urban land.Its detailed rules keep applying until the POU is approved.
2010 General PlanNothing. It was annulled by the Supreme Court in 2015.No effect. The new plan provides no compensation scheme linked to it.

Irregular areas

The 11 areas the plan identifies

Article 4.6.1 of the planning rules identifies eleven groups of irregular buildings on rural land. Until their own plan is approved, they are placed under AFO status for now.

  1. El Potril, north of the GuadaizaTo be integrated into the urban fabric.
  2. Between the A-7, the Istán road, URP-NG-10 and PA-NG-1To be integrated into the urban fabric.
  3. Cerro EspartalSpecial environmental and territorial plan.
  4. North of the La Ermita estateSpecial environmental and territorial plan.
  5. North of Bello HorizonteSpecial environmental and territorial plan.
  6. Los Molineros (1)May have its own development scheme.
  7. Los Molineros (2)May have its own development scheme.
  8. Los Molineros (3)May have its own development scheme.
  9. North of Las Chapas (1)Special environmental and territorial plan.
  10. North of Las Chapas (2)Special environmental and territorial plan.
  11. North of Las Chapas (3)Special environmental and territorial plan.

Planning check

We tell you where your property stands

We review the licence, the Cadastre, the Land Registry and the planning of your plot, and explain your options: apply for AFO, legalise, sell, buy or wait for the POU.

  • Registered Spanish lawyers with planning and property experience
  • Meetings in Marbella by appointment, or by video call
  • In English and Spanish
Consultation: €150, VAT included

Prefer to talk? +34 955 314 558 · info@peraltarojas.com

Tell us about your property

Tell us the area, whether you own or are buying, and what worries you. We reply within 24 hours.

Documents

What to ask for and why

DocumentIssued byWhat it is for
Land Registry extract (nota simple)Land RegistryOwner, charges, registered building and marginal notes (for example, AFO).
Cadastral certificateCadastreRecorded floor area and age. It must match what is built.
Building and first occupancy licencesMarbella town hallProof that what was built has a permit and matches the project.
Planning information certificateMarbella town hallWhich plan and regulations apply to the plot.
AFO resolutionMarbella town hallFor an irregular, time-barred home: utilities, permitted works and Land Registry note.
Certificate of ageArchitect or qualified surveyorProof of the date the works were finished.
Certificate of no planning breachMarbella town hallWhether any enforcement file is open.
Coastal boundary (deslinde)Coastal authority (Costas)For beachfront homes: whether public domain or easements apply.

Myths and facts

What is being said about the new plan

“The PGOM legalises 18,000 homes.”

The town hall estimates some 18,000 homes were left irregular. The plan gives a framework, but each home needs its own procedure.

“The plan is already in force.”

It takes effect the day after publication in the Málaga provincial gazette, which has not happened as of this date.

“40% is reserved for social housing.”

The town hall cites 20% of buildable area for affordable housing in new developments.

“The 1986 plan no longer applies.”

Its detailed rules apply to urban land until the POU.

“AFO status legalises the house.”

AFO recognises that demolition is no longer possible, but it does not legalise (art. 174 LISTA). It limits works and use.

Frequently asked questions

What people ask us most

Does the new Marbella PGOM legalise my property?

Not on its own. The plan sets the general framework, and each home depends on its licence, the date the works were finished and the planning of its plot. For an irregular, time-barred home the route is AFO recognition; legalisation is only possible if the works fit the plan.

When does the Marbella PGOM come into force?

The day after the approval and planning rules are published in the Málaga provincial gazette (BOP). As of 19 October 2026 that publication has not happened. Until then the 1986 plan applies.

What is the difference between the PGOM and the POU?

The PGOM sets the town model (urban or rural land, major infrastructure, protection). The POU sets the detail for each urban plot. Until the POU is approved, the detailed rules of the 1986 plan keep applying.

What is AFO status?

It applies to a finished building without a valid licence against which the authority can no longer act because time has run out. The town hall recognises it by resolution (6 months to decide; silence means refusal). It allows utility connections and upkeep or refurbishment works, but not extensions, and it is noted in the Land Registry.

Can I sell or mortgage an AFO property?

No rule prevents its sale, and the buyer must be told. A mortgage depends on each bank and the valuation; lenders often ask for more documents or lend less.

I have an unlicensed extension or pool. What should I do?

If it was finished over 6 years ago and is not on protected or public land, you can apply for AFO. If it fits the plan, a legalisation licence may be possible. If it is recent, take advice before the authority acts.

Is it safe to buy in Marbella now?

The plan adds legal certainty, but each purchase is still decided home by home. With a planning check before exchange and a well-drafted conditional contract, you can buy with confidence.

Should I wait for the POU before buying a plot?

It depends on what you want to build. Today buildable area and heights follow the 1986 plan, and the POU may change them. For a plot with a project, study the risk before committing.

Can the PGOM be challenged, like the 2010 plan?

It can be challenged before the High Court of Andalusia within two months of its publication. The 2010 plan was annulled partly because it tried to legalise through planning. The new plan had a full environmental assessment, a favourable regional report and no compensation scheme, but no plan is immune from appeals.

Does the new PGOM restrict holiday lets?

No. Holiday lets follow their own rules and, in buildings, the community of owners’ approval. An irregular planning position can still complicate the activity.

Does it apply to Benahavís, Estepona or La Zagaleta?

No. The PGOM covers the municipality of Marbella, including San Pedro Alcántara and Nueva Andalucía. Benahavís (home to La Zagaleta) and Estepona have their own plans.

How much does a check with your firm cost?

The consultation is €150, VAT included. If you then instruct us on a full planning review or an application, we give you a fixed written quote before we start.

Peralta Rojas Abogados
Resumen de privacidad

Este sitio web utiliza cookies para ofrecer la mejor experiencia de usuario posible. La información sobre cookies se almacena en tu navegador y realiza funciones como reconocerte cuando vuelve a nuestro sitio web, ayudándonos a comprender qué secciones de la web resultan más interesantes y útiles.